The primary park incorporates a ability of two hundred MW even though Sandrini II contains a potential of one hundred MW. The overall cost of the two initiatives weren't disclosed nevertheless, during design, in excess of 200 personnel ended up used. The projects are envisioned to see A few positions https://solarinstallersinbakersfield.blogspot.com/2024/12/4-hacks-to-find-reliable-commercial.html