Soils reports are obtained ahead of construction starts. The engineer who models the foundation employs the soils report in deciding what kind of foundation design to work with. In this way, problems which include differential settling after a while can be prevented. In Bangladesh, many soil testing companies present a https://jameso257twv0.lotrlegendswiki.com/user